Most of the machine equipment is still original, only the control electronics were retrofitted in 2007.
Water is fed to the power plant through a 2.3-kilometre-long upper ditch, which runs through an intake screen with an automatic screen cleaning machine.
An average of 4.9 million kWh of electricity is generated each year.