With the expansion of the rail network, signal boxes became necessary to monitor rail traffic. The Reit interlocking was the command interlocking for the entire station. For the parts of the line to the south that could not be seen from there, for the traffic to Siegen and into the Biggetal valley, the south signal box was necessary.